Thermal pump for the enterprise "Kyiv Technology", Industrial Angar 600 м² | Raymer RAY-24DS2-EVI (380V) black

Project task

The Kyiv Technology company applied for the organization of an effective heating and cooling system for a production workshop with an area of ​​about 600 sq. m and the height of the ceilings from 6 to 8 meters. The main requirement of the customer was to ensure a stable microclimate in the room, regardless of external weather conditions, as well as minimize energy consumption.

Answer

To implement the project, a cascading installation diagram of two heat pumps Raymer Ray-24DS2-EVI was selected (380V) black. This model provides high energy efficiency and stable operation even at low temperatures, which is critical for a large production room.

Additionally installed:

  • Two tanks-drivers (Stainless) Raymer IMP 100 liters to ensure stable hot water supply.
  • Indirect heating tank (stainless) Raymer DHWP 300L, which provides effective water heating from heat pumps.

The cascading circuit allows you to evenly distribute the load between the two heat pumps, Increasing the reliability and extending life of the equipment. This solution also helps to save electricity due to the optimal distribution of capacities.

1. Installation of external blocks of thermal pumps Raymer Ray-24DS2-EVI (380V) black

When implementing a project for the organization of heating and cooling of the production workshop area 600 sq. m were installed two outer blocks of heat pumps Raymer RAY-24DS2-EVI (380V) black.

Preparatory work:

At first, the optimal place was chosen for installing external blocks. Such factors were taken into account, How:

  • Distance from walls and other structures to provide proper ventilation;
  • Minimization of pipelines length to reduce heat loss;
  • Easy access for maintenance and preventive examinations.

The preparation of the base for external blocks was carried out. Reliable metal metal stands were made, which provide:

  • Stability of the structure;
  • Corrosion protection due to a special coating;
  • Installation on vibroopores to reduce noise and vibration during operation.

Installation of external blocks:

Thermal pumps are raised and installed on prepared stands. During installation, special attention was paid to proper alignment of units, to avoid excessive stress on compressors and increase the efficiency of work.

Each block was securely recorded, connected to the main pipelines for the circulation of the refrigerant and the hydraulic system. The pipes are additionally isolated by heat -resistant materials to prevent heat loss.

Electric connection is made in compliance with all safety requirements. Three -phase network connection (380AT) carried out through special protective machines to prevent voltage jumps and short circuits.

To protect against external influences (rain, snow, wind) A special coating for connecting nodes and cables is provided.

2. Basic principles of installation of a cascade scheme

Parallel connection of heat pumps:
Both heat pumps are connected in parallel to the main pipeline, which allows you to distribute the load evenly between them. This ensures more smooth operation of the system and reduces the wear of equipment.

Smart control:
The cascading circuit allows you to automatically adjust the amount of active heat pumps depending on the needs of the object. for example, In the off -season or during low load periods, one pump can work, Whereas in the winter, both pumps are turned on simultaneously.

Increased reliability:
In case of failure of one of the heat pumps, the second continues to work, Supporting the minimum necessary level of heating or cooling. This is critical for large industrial facilities.

Optimization of energy consumption:
Cascading scheme allows you to save electricity, Since thermal pumps work alternately or jointly, depending on the need for warmth or cold.

Ease of maintenance:
This configuration simplifies the process of prevention and repair, since you can temporarily disable one pump for service without stopping the entire system.

3. Installation of Raymer: Preparatory stage

When implementing a project for heating and cooling the production workshop area 600 sq. m planned the installation of two Raymer, which provide stable circulation of the coolant in the system and maintain the necessary temperature in the room.

Choosing an installation location:

For hydraulic motels, the corner part of the room was allocated along the wall with good ventilation and free access for maintenance.

The required distance of all elements of the engineering system is taken into account for convenient connection of pipelines and an electric network.

Preparing the base:

A solid metal surface with anti -vibration lining was pre -prepared to reduce noise and vibrations during operation.

Special fasteners are applied, guaranteeing the stability of the structure even at maximum loads.

Equipment placement:

Hydremodules were installed parallel to each other, to provide easy access to each of them during service.

The distance between them was observed taking into account the technical recommendations of the manufacturer for optimal air circulation and convenient connection to the highways.

Carrying out electrical work:

Electric cables were laid to each hydro -moer using high -quality copper wires, providing stable nutrition.

Distribution boxes are installed and the connection points to voltage stabilizers were prepared.

4. Connection of pipelines between two hydraulic models and their integration with buffer containers

After the preparatory stage of installation of the Raymer hydroelectric mounds, work began on connecting pipelines and integration with an external unit and system tanks began. This is one of the key stages, ensuring the effective operation of the entire heating and cooling system in the production workshop.

Connecting pipelines between hydraulic motels:

Marking places for connecting the feed and reverse pipelines between the two hydraulic machines.

To ensure maximum efficiency, high -quality metal -plastic pipes with increased resistance to pressure drops and temperatures were used.

All pipelines are pre -insulated with special insulation, which minimizes heat loss.

Moving hydrofoles to cascade:

The hydraulic boards are connected according to the parallel cascade connection scheme. This scheme allows both hydraulic models to work together, Distributing the load evenly and providing uninterrupted circulation of the coolant.

Special balancing taps were installed to regulate the flow rate of the coolant between the modules. This provides uniform pressure distribution and increases the efficiency of the system.

Installation of locking reinforcement:

For convenient maintenance of each of the hydraulic models, ball valves are installed on the input and output contours. This allows you to isolate any of the modules without stopping the entire system during maintenance.

Finding valves are installed additionally installed, preventing undesirable circulation of the coolant in the case of stopping one of the hydraulic motels.

5. Connection to buffer containers

The system used two buffer containers Raymer IMP 100 liters, placed along the wall near the hydraulic moil.

The tanks are fixed on special stands with anti -vibration gaskets to reduce noise and vibration during operation.

Integration of buffer containers into the circuit:

From hydraulic mopures to buffer containers, the main supply and reverse pipeline is laid.

For efficient operation of the system, the correct connection of the input and output pipes was provided, which provides uniform filling of containers with a coolant.

Three -way valves are used, which automatically regulate the flow of coolant between buffer containers and the main heating contour.

Hydraulic balancing:

In order to avoid hydraulic boards and stable operation of the entire system, hydraulic balancing of the contours was performed.

The air vents were installed in key points for removing air from pipelines and preventing the formation of air plugs.

Thermal insulation:

All trunk pipes, connecting hydraulic boards and buffer containers, insulated with high -quality insulation to reduce heat loss.

Particular attention is paid to the places of joints and threaded connections, which are additionally treated with sealants to prevent leaks.

After completing the installation of pipelines and connecting to buffer containers, The system was ready for testing. The cascading connection of hydraulic moil in combination with buffer tanks allows you to evenly distribute the load, maintain a stable temperature in the system and increase its effectiveness.

6. Connecting indirect heating tank Raymer DHWP 300L

After completing the installation of two Raymer hydroelectric mowers and their integration with buffer containers, The next step was the installation and connection of an indirect heating tank Raymer DHWP 300L. The main purpose of this tank – Providing uninterrupted hot water supply for the needs of the production workshop area 600 м², as well as optimizing the efficiency of heat pumps.

The tank is installed next to buffer containers. Convenient access to the connection pipe is provided, safety valve, audit hatch and circulation pump for maintenance. The tank is mounted on an even base using anti -vibration gaskets, which reduce noise and vibration during operation.

Connection to the heat pump

A separate connection circuit is installed from the Raymer Ray-24DS2-EVI heat pump hydraulic pump. (380V). Pipelines to Baku are isolated by thermo -insulating material, which minimizes heat loss during transportation. At the entrance and output of the coolant, the taps are mounted – for the convenience of maintenance or dismantling without stopping the entire system.

Warm -expanded circuit

The tank is equipped with a highly effective copper heat exchanger, ensuring the rapid heat transfer. The connection diagram of “top-down” provides uniform heating of water throughout the volume of the tank and reduces the risk of temperature stratification.

Integration into the circulation system

Grundfos circulation pump is connected to the tank, which is responsible for the stable movement of water between the tank and the consumption system. This allows maintaining a constant temperature of the hot water, Even in peak hours of use.

Installation of a three -way valve

The diagram provides for the installation of one three -way valve, which automatically switches the flow of the coolant between the buffer capacity and the indirect heating tank. Thanks to this, the priority of the hot water – When there is a request for hot water, The system primarily directs energy to its heating.

Safety and reliability

A safety valve is installed at the output, excessive.
Automatic air vent is also provided, preventing the formation of air plugs and ensuring stable operation of the system.

After all the work is completed, the tank Raymer DHWP 300L was fully integrated into the heat supply system. He effectively provides the needs of the workshop in hot water, reducing the load on thermal pumps and allowing rationally the use of energy. Automated control system with a three -way valve provides flexible switching modes, which contributes to energy efficiency and reduction in operational costs.

7. Distribution of heat in the room

For the effective distribution of heat in the production room, it was used A set of HC45-3S air-polling device with a rotary bracket and a three-stage fan speed regulator.

The device provides the supply of warm air using a fan, which drives the air through the heat exchanger, heating. Thanks to the rotary bracket, the possibility of adjusting the direction of the flow of warm air was ensured, which allows you to effectively warm as the main work area, and remote sections of the room.

A three -stage regulator allows you to choose the operating mode of the fan depending on the temperature conditions in the room – from the minimum to maintain a comfortable temperature to maximum for rapid heating after long breaks or opening the gate.

As a result of the installation of this equipment, uniform distribution of heat throughout the room was achieved and the energy efficiency of the system was increased.

The heat transfer between the buffer containers and the HC45-3S air-polling device occurs using a water coolant, which circulates in the closed circuit of the heating system.

Buffer containers accumulate heat, which is generated by heat pumps. From there, the coolant is supplied to the heat exchanger, built-in in the HC45-3S air-feeding device. In the heat exchanger, hot coolant transfers heat to the air, which the device fan drives through the ribs of the heat exchanger and distributes in the room.

After heat selection, the cooled coolant is returned back to the buffer capacity for re -heating. This process takes place continuously, providing stable temperature and efficient use of accumulated energy.

Thus, buffer containers act as a heat source, and accessories HC45-3S – In the role of an effective distributor of this heat in the room.

Why is the heat pump Raymer Ray-24DS2-EVI (380V) Black – This is an extremely effective solution for industrial premises and businesses?

The choice of heat pump for heating (and cooling) industrial premises are a critical solution, which affects not only comfort, but also for the stability of business processes, Energy costs and the overall efficiency of the enterprise. Raymer RAY-24DS2-EVI (380V) Black - One of the most successful models in this segment. Below we consider in detail, Why is this thermal pump can be considered super -efficient for production facilities and business as a whole.

1. Power, corresponding to the needs of industrial facilities

Raymer Ray-24DS2-EVI has high thermal power, which allows you to effectively heat or cool large volumes - for example, Production workshops, composition, Automobiles, food or light industry workshop. With the right calculation, one or more such pumps can close the need for climatic comfort in areas of hundreds of square meters.

2. Inverter technology with an EVI compressor

The model is equipped with an inverter compressor with EVI technology (Enhanced Vapor Injection), which provides:

  • stable operation at extremely low temperatures -up to -30 ° C;
  • Preservation of high efficiency (Energy transformation coefficient) Even in the cold;
  • Careful attitude to equipment – The inverter gradually changes power, which reduces compressor wear.

This is extremely important for business, After all, the system will not stop with strong cooling, and will not require expensive heaters in peak periods.

3. Energy efficiency = savings

One of the main advantages of Raymer Ray-24DS2-EVI is a high coefficient of COP efficiency (from 3.5 to 5.0), That is, for each kilowatet of electricity, the pump issues before 5 kW thermal energy. Compared to traditional electric ships or gas systems, This:

  • reducing heating costs by 40-60%;
  • Investment payback in the system - on average 2-4 of the year;
  • Predictability of energy consumption costs (It is important for business planning).

4. It works for heating, Cooling and DHW - universal solution

Raymer Ray-24DS2-EVI-these are three systems in one:

  • Heating in winter.
  • Cooling in the summer (works as air conditioning).
  • Hot water supply all year round (When connecting indirect heating boilers).

For business, this means saving on equipment and simplification of infrastructure – instead of three separate systems, One installed, But multifunctional.

5. Reliability and autonomy in work

All key components are Japanese or European production (Panasonic, Carel, Danfoss).
The system automatically regulates operation depending on external temperatures, Labbels, Day/night regimen.
The ability to connect to the Smart House control system or BMS, which allows you to remotely control and monitor the work.
Can be equipped with a source of uninterrupted nutrition (IBP) for protection in the case of an electricity loss.

This is especially important at objects with continuous processes or expensive equipment, which is sensitive to temperatures.

6. Minimum service - Maximum resources

Thermal pump needs minimal maintenance. Subject to operating standards, it can work 10-15 years without serious interventions. For comparison: Gas or solid fuel boilers require annual diagnostics, Cleaning, chimney control and the like.

7. Environmental friendliness and compliance with modern standards

Raymer Ray-24DS2-EVI uses environmentally friendly refrigerant, which does not harm the ozone layer and complies with European standards. This is important:

  • for enterprises, having environmental certification;
  • When introducing an ESG politician;
  • In preparation for state or international tenders, where compliance with environmental norms is required.

Raymer RAY-24DS2-EVI (380V) Black - This is not just heating equipment, This is a strategic business solution, combining in itself:

  • Energy efficiency;
  • reliability;
  • Multifunctionality;
  • compliance with the requirements of the time.

For industrial premises, where the stable temperature matters to preserve products, security of people and reliability of technological processes, This model is one of the best investments in comfort, energy conservation and long -term efficiency.