An object: Private house Western Ukraine.
Tasks and solutions: Initially, the task of the project was low-temperature heating through underfloor heating., around the house. The partners were faced with the task of competently selecting a heat pump and boiler equipment, heating system design, boiler room with subsequent installation. After calculating heat losses, Raymer inverter air-to-water heat pump EMI was chosen (Reimer) split

RAY-15DS1-EVI 380V 15 kW.

Heat pump installation, installation of boiler equipment, start-up and commissioning of the system was carried out with copper piping by qualified engineers.